By the end of this session, the participants will be able to:
Identify the applicable scenarios where the procurement strategy may call for the use of Plant, Design, Supply, Installation and Commissioning Contracts
Recognize the special features of Plant, Design, Supply, Installation and Commissioning Contracts including the division of roles and responsibilities among the Employer, Contractor and Project Manager.
Session 1: Introduction to Procurement of Plant, Design, Supply and Installation Contracts
Session 2: Setting Performance parameters of the Facilities and/or its preliminary (concept) design and the need for Prequalification (setting of Qualification criteria)
-
5Learning objectives of this session
-
6The Technical Specifications of the Facilities
-
7Single or Two-Stage Bidding Process
-
8The need for Pre-Qualification of Bidders and the setting of prequalification criteria
-
9General Experience
-
10Particular or Specific Experience
-
11Financial Capacity
-
12Personnel Capabilities
-
13Access to critical Equipment
-
14Subcontractors’ Qualifications
-
15_ Joint Venture’s Pre-qualifications
-
16ASSIGNMENTS - SESSION III
Session 4: MDBs’ Standard Bidding Documents for Design, Supply and Installation of electro-mechanical plant: Instructions to Bidders (one and Two-stage bidding process)
-
17Learning objectives of this session
-
18The Structure of the MDBs’ SBD for procurement of Plant: Design, Supply and Installation
-
19PART 1 – BIDDING PROCEDURES
-
20PART 2 – EMPLOYER’S REQUIREMENTS
-
21PART 3 – CONDITIONS OF CONTRACT AND CONTRACT FORMS
-
22The Instruction to Bidders (ITB)
-
23Provisions of the ITB:
-
24ASSIGNMENTS - SESSION IV
Session 5: MDBs’ Standard Bidding Documents for Design, Supply and Installation: Bid Data Sheet
Session 7: Bidding Forms and Pricing Schedules
-
29Learning objectives of this session
-
30Section IV Bidding Forms: Letter of Bid
-
31Letter of Bid (Two Stage Bidding- First Stage Technical Bid)
-
32Letter of Bid (Two Stage Bidding- Second Stage Technical and Financial Bid)
-
33Forms to be filled by the Bidder to demonstrate its Qualifications (Experience, Capacity and Financial strength)
-
34Manufacturer's Authorization
-
35ASSIGNMENTS - SESSION VII
Session 8: The Employer’s Requirements
-
36Learning objectives of this session
-
37The contents of the Employer Requirements’ section of the bidding documents
-
38The contents of each of the documents comprising the Employer’s Requirements Section of the bidding documents
-
39Forms to be used for Completion Certificate and Operational Acceptance Certificate:
-
40ASSIGNMENTS - SESSION VIII
Session 9: Bidding Forms- Contents of the bidder’s Technical Proposal
Session 10: General Conditions of Contract
-
45Learning objectives of this session
-
46Introduction
-
47Key provisions of the ENAA/MDBs’ General Conditions of Contract
-
48Section B: Subject Matter of Contract (Clauses 7-10)
-
49Section C: Payment (Clauses 11-14)
-
50Section D: Intellectual Property (Clauses 15-16)
-
51Section E: Execution of the Facilities (Clauses 17-25)
-
52ASSIGNMENTS - SESSION X and XI
Session 11: General Conditions of Contract (GCC)-Cont’d
Session 12: Particular Conditions of Contract (PCC)
Session 13: Contract Agreement and its Appendices
-
62Learning objectives of this session
-
63Introduction
-
64Purpose and key contents of each of the Contract Forms
-
65Appendix 1: Terms and Procedures of Payment
-
66Appendix 2. Price Adjustment
-
67Appendix 3. Insurance Requirements
-
68Appendix 4. Time Schedule
-
69Appendix 5. List of Major Items of Plant and Installation Services and List of Approved Subcontractors
-
70Appendix 6. Scope of Works and Supply provided by the Employer
-
71Appendix 7. List of Documents for Approval or Review
-
72Appendix 8. Functional Guarantees (FGs)
-
73ASSIGNMENTS - SESSION XIII
Session 15: Bid Evaluation using Life Cycle Costing method (LCC)
-
74Learning objectives of this session
-
75Introduction
-
76The steps of the bid evaluation process for procurement of Design, Supply and Installation contracts
-
77Only bids who pass the Preliminary Examination stage are admitted to detailed technical evaluation by the BEC.
-
78Economic (Financial) Evaluation of Bids
-
79Bid Evaluation on the Basis of Life Cycle Cost
-
80Extension of Bid Validity
-
81Determination of Award
-
82ASSIGNMENTS - SESSION XV
FAQ 1
Faq Content 1
FAQ 2
Faq Content 2
Productivity Hacks to Get More Done in 2018
— 28 February 2017
- Facebook News Feed Eradicator (free chrome extension) Stay focused by removing your Facebook newsfeed and replacing it with an inspirational quote. Disable the tool anytime you want to see what friends are up to!
- Hide My Inbox (free chrome extension for Gmail) Stay focused by hiding your inbox. Click "show your inbox" at a scheduled time and batch processs everything one go.
- Habitica (free mobile + web app) Gamify your to do list. Treat your life like a game and earn gold goins for getting stuff done!
Stars 5
3
Stars 4
0
Stars 3
3
Stars 2
0
Stars 1
0